Commercial Projects Division

Door hardware scheduling and supply for commercial projects.

From specification to handover, door by door. One schedule, one supplier, one point of contact, so your site managers and estimators are not chasing three wholesalers and a locksmith.

Download our capability statement (PDF, 4 pages)

25 yearsin the door hardware trade across Western Australia.

24 hoursWe come back to you within one business day of receiving your plans.

One weekWe aim to have your first draft schedule back inside a week.

No chargeThe schedule is prepared at no charge, and we quote supply off the finished schedule.

A door hardware business, not an online store.

Entry Point is a Perth based door hardware specialist with 25 years in the trade, a showroom in Palmyra, our own warehouse, and a dedicated projects team that schedules and supplies commercial work across Western Australia.

Hardware is one of the last trades to be resolved and one of the first to be blamed. Getting it right early saves your team time, avoids rework on site and keeps certification and handover on track.

Sectors we work in

  • Offices and fitouts
  • Hospitality
  • Health and aged care
  • Education
  • Multi residential
  • Mixed use
  • Custom homes and renovations

How we run a project

Reviewed early. One schedule, one supplier, one point of contact.

  1. 1

    Document review

    Send floor plans, elevations, a draft schedule or a marked up set. We are in touch within 24 hours, raise queries before pricing and work to your specification. Supplier schedules from ASSA ABLOY, Allegion or dormakaba are checked for by others, TBC and missing items.

  2. 2

    The door hardware schedule

    Every opening specified: function, hardware, finish, handing, backset, keying and quantities, with hinges sized to the door weight, checked against fire, access and the project specification. First draft inside a week.

  3. 3

    Review without the email chain

    A PDF to print or issue, plus a live link where you and your client comment door by door. One version and a clear record of what was decided. We reissue until it is signed off.

  4. 4

    Priced proposal

    Priced against the approved schedule, with lead times, inclusions, exclusions and assumptions set out up front. No surprises at order stage.

  5. 5

    Ordered, labelled and staged

    For a project, allow two to four weeks from order to bring in, label, pack and deliver every item. Each one is labelled to its door number in our warehouse, then delivered in stages to suit your programme.

  6. 6

    Keying and access control

    Keyed alike and master keyed systems coordinated with the locksmith and, where required, your security contractor for access control.

  7. 7

    On site commissioning

    On the right projects we walk the job with your installer, check every door against the schedule, confirm keying and handing, and sort adjustments before handover. Confirmed up front.

  8. 8

    Handover

    A warranty register covering every supplier on the job, ready for your handover documentation and the client's facility manager.

The complete door hardware package

CategoryWhat it covers
Locks and keyingMortice locks, cylinders, keyed alike and master keyed systems, coordinated with the locksmith.
Levers, pulls and furnitureCommercial and accessible lever sets, entrance pulls, privacy sets with emergency release and indicators.
Door closersOverhead and cam action closers, hold open and delayed action, sized and set per door.
Exit and egressPanic and exit devices, flush and surface bolts, emergency release hardware.
Hinges and pivotsCommercial butt hinges, concealed hinges and pivot systems for standard and heavy doors.
Fire, smoke and acousticHardware suited to fire and smoke doors, plus smoke, acoustic and weather seals.
Access control readyElectric strikes and locks prepared for access control, coordinated with your security contractor.
Protection and accessoriesDoor stops, holders, kick plates, door edge protection and the small items that are easy to miss.

The requirements we check

Every schedule is checked door by door against the project specification and the codes that drive hardware selection, including the NCC, AS 1905.1 for fire doors and AS 1428.1 for access. Your building surveyor, fire engineer and access consultant remain the final authority; we work to their reports.

What we catch at schedule stage

A privacy set where an entrance set was needed. Hinges under rated for a solid core or fire door. A backset that does not match the lock. A finish discontinued halfway through the build. Items marked by others that nobody ends up supplying. Each is simple to fix on paper and costly on site.

Recent projects

MJA Studio, new office

High end door hardware throughout the new studio, including disabled compliant products.

Five star hotel refurbishment, Exmouth

Door hardware scheduled, labelled to each door and delivered to site.

Further references available on request.

Brands we supply

Lockwood, dormakaba, Allegion, Lockton, Kilargo, Designer Doorware, Halliday + Baillie, Bellevue Architectural, Havolka, Zanda, Windsor and many more, selected door by door rather than locked to one catalogue. Where a specification names a supplier, we price and supply to it.

Selections in our Palmyra showroom

Bring your team or your client in and we run through the options side by side before you specify. Project orders are packed and labelled to the schedule in our own warehouse, ready for site.

About the showroom

Renovations and custom homes

Renovations are where hardware gets messy: mixed door thicknesses, rebated jambs, backsets that match nothing current. Depending on location we come to site and build the schedule from the doors that are actually there.

Builders, you can hand this one off. Put us in touch with the owner or designer and we run the hardware side start to finish.

What we need from you

  • Floor plans or a door schedule, in any format
  • Your preferred finish or scheme
  • Any brands already specified
  • Your programme, so we can plan lead times

Only have half of that? Send it anyway and we will tell you what is missing.

Common questions

How much does the scheduling service cost?

Nothing. We schedule the project at no charge and quote supply off the finished schedule. The schedule is prepared on the basis that Entry Point supplies it.

Can you review a supplier schedule we already have?

Yes. Where an ASSA ABLOY, Allegion or dormakaba schedule exists, we review it and flag by others items, TBC items and anything missing before we price.

Can you match hardware already specified?

Yes. If the architect or client has selected a range, we schedule around it and fill the gaps with matching product.

What are the lead times?

For a project, allow two to four weeks from order. That covers bringing in every item, labelling it to its door and packing it for staged delivery. Individual items ordered online follow our standard delivery and lead times. Exact timing for each product is set out in your proposal.

Do you come to site?

Depending on the project, yes, for renovation surveys and commissioning visits. We confirm both up front.

Have a project coming up?

Send us your plans or tender documents, or call our projects team.

Phone 1300 522 163

Email sales@entry-point.com.au

Showroom 4/327 Canning Highway, Palmyra WA 6157

Hours Monday to Friday, 8am to 4pm